![]() ![]() ![]() For control, you need to hear the tune from both instruments and match them at all times so that the tuner or the pipe emits the right sound and you replicate the sound to the necessary string. For planning, you need to tune the guitar and the steps involved are: you need to plan what would be the correct way of placing the guitar while in the right posture, taking the help of a pitch pipe or an analogous/digital tuner and turning the pegs of the guitar to change the tenacity of the metallic strings attached to the guitar front. Think of Production Planning and Control ( PPC) as the action of tuning a guitar. Production planning and control looks at efficiency and economic benefits of the production line and aims at making these processes design-worthy and lean for effectiveness and great efficiency. The start of production planning and control is kick-started after you, the entrepreneur, has made the decision regarding the product design and production systems and processes.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |